Soil and Groundwater Remediation

Exploitation of treatment centre Sol&Val Monsin (Belgium)

The Recycling Centre and Temporary Storage Site Sol&Val Monsin is located at the heart of the industrial zone of Liege and accessible through several transportation channels: the centre has a...

The Recycling Centre and Temporary Storage Site Sol&Val Monsin is located at the heart of the industrial zone of Liege and accessible through several transportation channels: the centre has a direct link to the Maas River which is an important waterway connecting the Netherlands and France. Being located in the vicinity of the A25, the centre is easily accessible over the E40 coming from Ostend, the E42 coming from Mons and the E25 coming from Arlon.

Key figures
Country

België

Client's name

Envisan NV

Contractor's role

Eigenaar

Period
July 7, 2015 to July 1, 2021
PROJECT DESCRIPTION

Exploitation of the treatment centre Sol&Val Monsin

METHODOLOGY

Biological or physico-chemical treatment of contaminated soils or other mineral waste.

CAPACITY

150,000 tonnes/year

TYPE OF CONTAMINANTS

Mineral oil, HAP, heavy metals

Soil and groundwater remediation on former Barco site, Courtrai (Belgium)

On the site where the company buildings of technology company Barco were established, a new housing project will be executed.
Meanwhile, the buildings have been demolished. The site itself...

On the site where the company buildings of technology company Barco were established, a new housing project will be executed.
Meanwhile, the buildings have been demolished. The site itself is being thoroughly remediated by Envisan.
Our affiliate PSR is one of two companies that will execute the housing project.

 

Key figures
Country

Belgium

Client's name

Cortoria NV

Contractor's role

Main Contractor

Period

08.2008 - 2012 (soil remediation)
2018 (groundwater remediation)

Technical specs
Volume

Water treatment (10 m³/h)
Soil excavation and treatment of 1,300 tonnes (biological treatment)

Soil and groundwater remediation at former chemical factory, Antwerp (Belgium)

Envisan executed the soil and groundwater remediation on the site of a former chemical plant in Antwerp.
An infiltration system was installed and the groundwater was drained and treated....

Envisan executed the soil and groundwater remediation on the site of a former chemical plant in Antwerp.
An infiltration system was installed and the groundwater was drained and treated.

 

Key figures
Country

Belgium

Client's name

Confidential (Petrochemical Company)

Contractor's role

Main Contractor

Period

04.2007 - 12.2010

Technical specs
Methodology

Excavation and biological and physico-chemical treatment of highly polluted areas.
In-situ remediation.
Groundwater treatment 10 m³/h (oil/water separator, automatic sand filtration, active carbon filtration).
Reinfiltration.

Volume

11,000 tonnes

Type of contaminants

Mineral oil, BTEX

Remediation works for former chemical factory, Beringen (Belgium)

The site of a former chemical factory in Beringen (Belgium) was heavily polluted.
The contaminated soil was excavated and treated and a water extraction system and compressed air injection...

The site of a former chemical factory in Beringen (Belgium) was heavily polluted.
The contaminated soil was excavated and treated and a water extraction system and compressed air injection network were installed.

 

Key figures
Country

Belgium

Client's name

Confidential

Contractor's role

Main Contractor

Period

04.2005 - 10.2010

Technical specs
Volume

Installation of water extraction network consisting of 157 extraction pits.
Installation of compressed air injection network consisting of 20 injection filters.
Excavation and processing of contaminated soil (ca 2,000 tonnes).
Installation and operation of a PLC-controlled injection system.
Installation and operation of a PLC-controlled water extraction system (capacity: 5 m³/hour or 120 m³/day).
Installation and operation of a water treatment plant (capacity: 5 m³/hour or 120 m³/day).

Soil and groundwater remediation at former petrol station, Aalst (Belgium)

In this very busy urban environment, Envisan was responsible for removing a storage tank and remediating both soil and groundwater.

 

In this very busy urban environment, Envisan was responsible for removing a storage tank and remediating both soil and groundwater.

 

Key figures
Country

Belgium

Client's name

Bofas

Contractor's role

Main Contractor

Period

27.02.2012 - 01.2013

Technical specs
Scope

Excavation of polluted soil and soil vapour and groundwater extraction as remediation technique for the remaining soil and groundwater contamination

Methodology

Tank removal
Excavation to a depth of 3.3 to 4 m-bgl by means of trench boxes. Drainage of 5 m³/hr with groundwater treatment system (oil-water separator – stripping tower – air phase activated carbon filter)

Volume

Off-site biological soil treatment: 550.14 tonnes

Type of contaminants

MINERAL OIL + BTEX

Pilot tests on Biochim site, Machelen (Belgium)

The Biochim site in Machelen is generally known as the most polluted site in Flanders. Following a factory fire with a solvent processor thousands of litres of solvent seeped into the soil and...

The Biochim site in Machelen is generally known as the most polluted site in Flanders. Following a factory fire with a solvent processor thousands of litres of solvent seeped into the soil and groundwater. The joint venture Jan De Nul-Envisan was contracted early 2011 by OVAM for executing several pilot tests on this site in view of the later soil and groundwater remediation up to 4 metres below the ground. The pilot projects include: multiphase vacuum extraction, selective excavation in an enclosed environment and floating layer recovery (LNAPL).

 

Key figures
Country

Belgium

Client's name

Ovam

Contractor's role

Main Contractor

Periode

01.04.2011 - 16.12.2011

Technical specs
Methodology

Excavation in aconfined space with compressed air respiration and odour control
Multi Phase Vacuum Extraction (150 m³/hr air, 5 m³/hr water) by means of a high-vacuum pump with LEL-controlled fresh air valve
Water treatment: 2 oil/water separators, sand filtration unit, stripping tower, biorotor and 2 activated carbon filters
Air purification: catalytic oxidation unit, scrubber, biofilter and activated carbon filter
Pure product (LNAPL) recovery by means of 3 types of skimmer: 2 membrane skimmer and 1 floating skimmer

Volume

The volumes were limited as it concerned pilot projects

Soil and groundwater remediation at former oil manufacturing company Mottay & Pisart, Vilvoorde (Belgium)

On account of the former activities on this site, the soil was heavily polluted with mineral oil and BTEXN. The groundwater contained a floating layer over no less than 75% of the site. The site...

On account of the former activities on this site, the soil was heavily polluted with mineral oil and BTEXN. The groundwater contained a floating layer over no less than 75% of the site. The site was also raised with ash-containing material showing strongly increased concentrations of heavy metals. The site was remediated by order of NV Zennebroeck. The excavated soil was divided into three categories: soil that can be reused on the site, soil that must be discharged for thermal treatment and soil to be dumped.

 

Key figures
Country

Belgium

Client's name

NV Zennebroeck

Contractor's role

Main Contractor (Part JDN: 100%)

Periode

2009 - 26.11.2010

Technical specs
Methodology

- excavation of soil contamination (with stability measures)
- removal of floating layer
- groundwater lowering with ground water purification (capacity 40 m³/h, oil water separator, automatic sand filtration, stripping tower, activated carbon filtration, metal adsorption filter)
- installation of an injection network for application of oxygen release compounds

Volume

- break away and removal of 3,200 tonnes of concrete surface
- removal and treatment of 65,000 l of a mixture of oil and water
- dumping of 16,700 tonnes of soil
- transport of 6,700 tonnes of soil for thermal treatment by ship
- reuse of 3,850 tonnes of excavated soils

Type of contaminants

Mineral oil (LNAPL), BTEXN and heavy metals

Demolition and soil remediation at former gas oil plant, Schaarbeek (Belgium)

It concerns the site of a former gas oil plant. This plant was demolished and the soil was remediated by Envisan.
In all, 20,000 tonnes of polluted soil were excavated. Subsequently, the...

It concerns the site of a former gas oil plant. This plant was demolished and the soil was remediated by Envisan.
In all, 20,000 tonnes of polluted soil were excavated. Subsequently, the groundwater was treated

Key figures
Country

Belgium

Client's name

NV TUC Rail

Contractor's role

Main Contractor

Periode

07.01.2013 - 01.11.2013

Technical specs
Scope

Excavation of about 20,000 tonnes of polluted soil
Drainage and subsequent groundwater treatment (10 m³/h)

Remediation of Carcoke-site, Zeebrugge (België)

Carcoke is the name of a cokes factory that was operational in Zeebrugge between 1900 and...

Carcoke is the name of a cokes factory that was operational in Zeebrugge between 1900 and 1996. 
During that period English coal was converted into cokes for the steel industry. In 1975, this factory merged with the cokes factory of Marly in Brussels, which was in operation until January 1993. After the closing of both factories heavily polluted sites were left behind. It was a real challenge to remediate the dilapidated and polluted factory sites of 14 ha and 12 ha respectively and to transform them into clean, valuable sites. Envisan assisted for both sites in their complete remediation. On both sites, hundreds of thousands of m³ of polluted soil were excavated and treated. The heavily polluted groundwater is pumped up using various pumping systems and treated in complex, aboveground treatment plants.

Key figures
Country

Belgium

Client's name

OVAM

Contractor's role

Main Contractor (Part JDN: 100%)

Period

15.05.2009 - 15.05.2010

Technical specs
Methodology

Excavation and Groundwater Remediation

Volume

Grid excavtion soil: 77,851 tonnes
Physicochemical treatment: 22,827 tonnes
Thermal treatment of contaminated soil: 2,534 tonnes
Reuse on site: 52,510 tonnes
Groundwater remediation: 15 m³/h

Type van contaminanten

Tar, PAH's, TPH, CN, heavy metals and other related contaminants

Remediation of gasworks site, Waterford (Ireland)

Remediation of the former Waterford gasworks site in Ireland. The polluted soil was excavated up to 6 metres deep in a selective process. The soil was stored, analysed, sieved and subjected to...

Remediation of the former Waterford gasworks site in Ireland. The polluted soil was excavated up to 6 metres deep in a selective process. The soil was stored, analysed, sieved and subjected to thermal treatment. Also the groundwater was extracted and treated.

 

Key figures
Country

Ireland

Client's name

Bord Gais Eireann

Contractor's role

Joint Venture Partner (Part Envisan 50 %)

Period

04.2006 - 05.04.2008

Technical specs
Project description

Remediation of the former Waterford Gasworks site in order to prepare it for a subsequent redevelopment comprising a mix of redevelopment, business, commercial and leisure facilities together with basement car parking.

Methodology

The remediation required the removal from site of contaminated soils which may be a potential future risk to site users, ground andsurface waters.
Excavation of soils to a max. depth of 6 m. Stockpiling, chemical testing and screening of the soils.
Transport of soils by lorry and ship for thermal treatment.
Installation of a basement retaining wall.
Grondwaterontrekking en -behandeling
Breken en verwijderen sloopafval

Volume

Site clearance: 1.1ha
Underground excavation: 38,000 m³
Total earthworks (excavation + backfill): 70,000 m³
Demolition and crushing of concrete: 3,050 m³

Type of contamination

PAH's, TPH, CN, Heavy Metals and other related contaminants